Member Login
Login Email:
Password:
Company Profile
Production
 

Moved into industrial park in May of 2006, and the production capacity has improved to 5000,000 sets / single shift from 2500,000 sets / double shifts; this industrial garden is five minutes away from Shenzhen international airport, with an area of 72,000 m2, construction area of 6,6000 m2, which strive to be a top-ranking auto and electron manufacturing base in the world.


MANUFACTURING CAPABILITY
  • 8 Production lines
  • Automatic production equipments with leading technology in the industry
  • Key equipment more then 30 sets
  • Production efficiency 9 units / man day


 
Hangsheng Electronics Co., Ltd.    All Rights Reserved

Powered and designed by tradeeasy